Our Experience

Project Experience

Our team of experienced project professionals at Proof Projects have assisted in delivering a number of projects across Australia. Here are some of the completed projects we are proud to have worked on.

Tailings Storage Facility Expansion 4

Project:  Tailings Storage Facility Expansion 4
Client:  South 32
Status:  Completed
Duration: 2020 - 2021
Commodities:  Pb, Ag, Zn
Main Service Area:  Mining
​
Services:  Project Manager, Project Supervisors, Construction Superintendent and Project Administration
Project Summary  The objective of the TSFE4 project was to provide tailings storage capacity for 30 months production with a 3.5m raise of Cell 3 to RL 271.1. The execution phase scope consists of mechanical works on tailings delivery and decant recovery systems, civil earthworks to construct the raise utilising in-situ tailings for working platform and local clay borrow materials for the raise; and installation of an internal tailings drainage system to improve tailings consolidation for future raises.

Cell 1 Buttress Project

​​Project: Cell 1 Buttress Project
Client:  South 32
Status:  Completed on time and under budget
Duration:  2019 - 2020
Commodities:  Pb, Ag, Zn
Main Service Area:  Mining
Services:  Project Manager and Project Supervisor, Construction Superintendent and Project Administration
Project Summary  The project involved the installation of a stabilising buttress on the northern, eastern and southern sides of the tailings storage facility including into the Decant Dam (water dam) to ensure adequate factors of safety for embankment stability under liquefied conditions. The works also consisted of an array of sand filters to intercept seepage flows and suppress surface seepage expressions. Design and construction of the Cell 1 buttress was expedited to ensure Cell 1 embankment would be compliant with ANCOLD freeboard requirements prior to the 2019/2020 wet season.

Crusher Exclusion Zone Access (CEZA) Project

​Project:  CEZA
Client:  South 32
Status:  Completed on time and on budget
Duration:  2016 - 2017
Commodities:  Pb, Ag, Zn
Main Service Area:  Mining
​Services:  Construction Superintendent, Project Control Specialist, Document Control, Technical Writer, HSEC Advisor, Project Planner
Project Summary  Construction of a replacement underground mining primary crushing in an active underground mining environment. Work involved all civil, mechanical piping, and electrical instrumentation works to provide a fully functioning primary crushing system. The business-critical project was executed under continuous shift or roster cycles, successfully delivered on time and on budget without incident.

Flinders River Environmental Mitigation

Project:  Flinders River Environmental Mitigation 
Client: Neilly Group Engineering (Queensland Government Land Council)
Status:  Completed on time and on budget
Duration:  2020 
Main Service Area:  Environmental
​Services:  Project Site Supervisor

Project Summary  Project site supervision of wet weather remediation works of a 1000m section of river frontage. Supervision of the installation of a 3:1 batter along the 100m of riverbed as well as excavating and filling of wash away gullies further back from the new position of the river bank. The project also included installation of 500 wooden piles into the 1000m section of mitigated river bank to stabilise and direct the flow of water, to allow sediment deposits in future flood events, rock batters and rock chutes placed in batter to deter future erosion events and hydroseeding of the batter and top sections of riverbank to promote stability and erosion control. 

A few words from one of our clients

"Thanks John, another example of a well-managed and executed project by you and your team. I know there has been a number of challenges faced as we moved through the phases on this and then into the commencement of TSFE4, but the professionalism and dedication showed by all involved is something to be proud of and is setting our operation up for success."

- Nigel, Engineering and Maintenance Manager, South 32 Cannington
Proof Projects project management Logo

Proof Projects Pty Ltd


​Address Kirwan, QLD 4817
Email [email protected]
  ©Proof Projects Pty Ltd. All rights reserved. Website by Grey and Grey.
  • Home
  • About Us
  • Project Services
  • Project Experience
  • Join Our Team
    • Positions Vacant
  • News
  • Contact Us